Labradorite Gemstone Phone Case for iPhone, Samsung, Pixel: Spiritual Rock Lover Gift
Labradorite Gemstone Phone Case for iPhone, Samsung, Pixel: Spiritual Rock Lover Gift
Couldn't load pickup availability
Transform your smartphone into a portal of beauty and spirituality with the Labradorite And Gold Phone Case, the ultimate accessory for crystal lovers and rock enthusiasts alike. This captivating phone case is meticulously crafted for a wide range of devices, including iPhone 16, 15, 14, 13, Samsung Galaxy S25, S24, S23, and Google Pixel 9 to 5. Each case showcases a stunning gemstone print of Labradorite, renowned for its mesmerizing play of colors that mirrors the aurora borealis.
Designed for those who cherish both style and spiritual connection, this gemstone phone case offers not just protection but also a touch of mysticism. Its durable casing ensures that your device remains shielded from everyday wear and tear while the golden accents add a touch of luxury.
Optimize your spiritual journey with this Zen phone case that seamlessly combines elegance with functionality. Whether you're looking for an iPhone pro max charm or a secure Samsung Galaxy s25 ultra casing, this mystical stone case is perfect for any occasion. Experience the allure of Labradorite and let your phone shine with celestial beauty.
Discover the perfect gift for rock lovers that combines both functionality and a sense of wonder. Order now and elevate your mobile experience with this unique Labradorite gemstone masterpiece.
🔍PRODUCT DETAILS
✅ Tough Case with Dual-layer protection: hard polycarbonate shell with a TPU silicone inner liner for shock absorption. The black inner layer is visible at the corners for added impact protection.
✅ Durable but lightweight—built for daily use.
✅ Precise, snug fit that wraps your phone.
✅ Stylish protection that guards against drops and tear.
✅ Supports wireless charging (not including MagSafe)
✅ Available in glossy or matte finish - both are completely opaque (not transparent)
✅ Clear, open ports for connectivity
✅ UV Protected
✅ Made with 100% polycarbonate (shell), 100% TPU (lining)
⚠ Note:
1. Design is printed on the polycarbonate shell; it is printed on a flat surface.
2. Textures or effects in the images are printed and flat; there are no raised, holographic, glitter, opalescent, or real-material (wood, flowers, fabric, leather, glass, stone) elements.
3. Colors may vary slightly due to variations in computer display settings.
📋CARE INSTRUCTIONS
Clean with a soft damp cotton or microfiber cloth (add a drop of dish soap if needed).
❌ Keep away from liquids containing high alcohol levels, as designs on the phone case may rub off. ❌ Keep away from direct sunlight to prevent yellowing.
❌ Avoid direct contact with hand creams and sun creams. Keep out of excessive heat.
🛒 HOW TO ORDER:
1. Select the phone model
2. Select the finish
3. Click the “Add to cart” button
4. Pay and complete the order.
⚠ Please Make sure that your saved address on Etsy is your current address. Your order will ship by default to your saved address.
If you entered the wrong address, please contact us right away. Addresses cannot be changed once the order is shipped.
🚚 PRODUCTION & SHIPPING INFORMATION
► Processing Time: After we receive your order and verify it, we send it to our printing partner the same day or the next business day, who prints the final design and ships it out to you.
► Production: All phone cases are made-to-order. Production usually takes 4-6 business days. Please allow extra time for holiday and weekend orders.
► Shipping: We ship via all major carriers (FedEx, UPS, USPS).
• Standard shipping within the U.S.: 2-5 business days depending on the destination. (Shipments to Alaska, Hawaii, Puerto Rico, and other U.S. territories may require an additional 7-12 business days.)
• International shipping may take from 2-4 weeks once production is complete.
⚠ We CANNOT guarantee specific delivery dates as once the order is shipped, there are many factors that may affect the final delivery timeline such as bad weather or holidays. Thank you for understanding!
❌ REFUNDS, RETURNS, AND EXCHANGES
- No returns or exchanges as all items are made-to-order.
- No refunds for “different from expected.” Please read the listing and view all photos carefully before buying.
- Defective items will be replaced. If your item arrives damaged or with a print defect, contact us immediately with clear photos.
⚠ BEFORE YOU ORDER
- Product images are for illustration only. Actual colors may vary slightly due to variations in computer display settings.
- Because phone dimensions and camera placements differ by model, the printed design placement may vary. Your case may not match listing photos exactly but be rest assured that we do our best to ensure the most accurate representation.
- Textures or effects in the images are printed and flat; there are no raised, holographic, glitter, opalescent, or real-material (wood, flowers, fabric, leather, glass, stone) elements.
- Double-check and select the correct phone model from the dropdown before ordering.
- Most iPhone, Samsung, and Google Pixel models are available; if you don’t see your device listed, please send me a message.
✨ WHY CHOOSE US?
► We’re a small family-run business focused on delighting customers
► Premium-quality, uniquely designed products: Our sturdy tough phone cases are crafted with passion, precision, and a whole lot of love to help you express your unique personal style. We want you to love your case.
► Fast shipping for timely delivery of heartfelt presents
► Seamless shopping experience from order to delivery
► Great customer service with support at every step. Customer satisfaction is our top priority
👉 Visit our shop for more beautiful phone cases to celebrate milestones and memories. https://www.etsy.com/shop/GoldenValueSG/edit?ref=seller-platform-mcnav§ion_id=38727162
Thank you for your business! We appreciate your support. We work hard to provide a high-quality product and the best customer experience for you. If you have any questions, just send us a message and we will take care of you.
This design was made with the assistance of AI. Labradorite Gemstone, galaxy phone case, crystal lovers, gemstone print, google pixel pro, iphone pro max, zen phone case, gemstone phone case, s25 ultra casing, iphone 12 plus case, iphone 13 casing, phonecases iphone 13, mystical stone case
EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY
Product information: Generic brand, 2 year warranty in EU and Northern Ireland as per Directive 1999/44/EC
Warnings, Hazard: For adults, Blank product sourced from South Korea
Share
